Development Type: Mixed-use Development

Type Of Developer: Public Sector

Start Year: 2015

Address: 성동구 성수1가 1동, 성수1가 2동, 성수2가 1동, 성수2가 3동 일대 1Dong, 2Dong, Seongsu-1ga, 1Dong, 3Dong, Seongsu-3ga, Seongdong-gu, Seoul, Republic of Korea

Website: https://uri.seoul.go.kr/surc/main.do

Contributor: audex

Location

Location Description
This area has remarkable transportation environment. This area is near to the Gangbyeon Expressway ( 강변북로 ), Dongbu Expressway ( 동부간선도로 ), several express ways, and the No.2 subway line ( 서울 2호선 )and Bundang subway line ( 분당선 ). So this area can easily access to the four main gates of old Seoul and the area of Gangnam which is the main business and residential and tour area in Seoul. Also, this area has both great nature environment and cultural sources. Seoul-forest ( 서울숲 ) is right near to this area which is the representative park among resting parks in the east-north side of the Seoul and Ttukseom Island Ecological park ( 뚝섬 생태공원 )and physical training facilities are also the great infrastructures for this area.

Case Report

Introduction

This area has its own unique local industry. For example, handmade shoes are the most representative local industry in this area. However, most of them are small-scaled industry and most workers among them are old-aged so young-aged workers should be flow into the area so that the local industry can grow up bigger with the local economy. This area also has mixed areas of residential areas and business areas, so the various problems are occurring because of the conflict between those programs. Such as, economic recession, weaken competitive edge of the industries, poor and inadequate residential environments and other trivial problems are distressing the cities. Also, population of this area has decreased about 26% since 1985 until these days, so the problem about the living safety was one of the most severe problems in this area. As these problems are getting worse so the project that could solve these problems and develop this area was necessary. Regenerating the project with coexistence of residential area, business, resting place, and the community and activating the local industry for the autonomy of the city and developing the residential quality of this area would be the main contents of this project. So that this project would develop safe and adequate living environment for the residents and activate the industrial economy to make more job opportunities for the residents and recover the local identity using historical and cultural sources in this area and grow the regenerative power itself by developing the capability and the competence of this area.

Development Info.

Development Scale: Region

Total Development Cost: 44300000000 won

Total Land Area: 886560 m2

Total Development Area: 886560 m2

Area Type: Urban Area - Urban Residential Area

Start Date: 2015/04/01

Opening Date: 2018/01/01

Planning Approval: 성수동 일반근린형 도시생활재생지역 Seongsu-dong general neighborhood type city regenerating area 2014.12

Lead Developer: Public Seoul ( N/A in detail )

Consultants: Experts in Seoul ( N/A in detail )

Background

Economic Context

This area has its own unique local industry. For example, handmade shoes are the most representative local industry in this area. However, most of them are small-scaled industry and most workers among them are old-aged so young-aged workers should be flow into the area so that the local industry can grow up bigger with the local economy.

Social Context

This area has mixed areas of residential areas and business areas, so the various problems are occurring because of the conflict between those programs. Such as, economic recession, weaken competitive edge of the industries, poor and inadequate residential environments and other trivial problems are distressing the cities. Also, population of this area has decreased about 26% since 1985 until these days, so the problem about the living safety was one of the most severe problems in this area. As these problems are getting worse so the project that could solve these problems and develop this area was necessary.

Environmental Context

This area has remarkable transportation environment. This area is near to the Gangbyeon Expressway ( 강변북로 ), Dongbu Expressway ( 동부간선도로 ), several express ways, and the No.2 subway line ( 서울 2호선 )and Bundang subway line ( 분당선 ). So this area can easily access to the four main gates of old Seoul and the area of Gangnam which is the main business and residential and tour area in Seoul. Also, this area has both great nature environment and cultural sources. Seoul-forest ( 서울숲 ) is right near to this area which is the representative park among resting parks in the east-north side of the Seoul and Ttukseom Island Ecological park ( 뚝섬 생태공원 )and physical training facilities are also the great infrastructures for this area. Such transportations and great nature environments and cultural sources are useful for regenerating project reusing the existing sources in this area.

Historical Context

This area has been continuously making jobs since 60 years ago, and this area is one of the representative heavy industry areas that has led the economic development of Seoul from the past. These days, there are many small manufacturer industries in this area such as handmade shoes industries. Today, there are many old buildings in this area. For example, buildings that have been built more than 20 years ago are possessing about 68% of this area getting worse as time goes by. Also, park and roads systems are remarkably low than any other areas in Seoul. For example, percentage of park area is about 5.4% in this area while the mean data of Seoul is 28.1%. However, this area has various historical and cultural sources such as old railroad, bridges from the Chosen dynasty, police mounted party events, and Arisu museum. These historical and cultural sources would be useful for the project of regenerating this area reusing the existing sources.

The Plan

Pre-planning Efforts

Building bicycle road. Replenishing infrastructures. Developing the local industry. Offering the space for the business. Supporting the social enterprise and the young entrepreneurship. Developing the tour route for the local culture. Developing the craftsman experiencing service for the tour. Operating the town school for the citizens in this area.

Vision Statement

Regenerating the project with coexistence of residential area, business, resting place, and the community. Activating the local industry for the autonomy of the city and developing the residential quality of this area. ( https://uri.seoul.go.kr/surc/main.do )

Goals and Objectives

Developing safe and adequate living environment for the residents. Activating the industrial economy to make more job opportunities for the residents. Recovering the local identity using historical and cultural sources in this area. Growing the regenerative power itself by developing the capability and the competence of this area. ( https://uri.seoul.go.kr/surc/main.do )

Issues and Problems

Physical deterioration of the city and the lack of social infrastructures. In detail, buildings that have been built more than 20 years ago are possessing about 68% of this area getting worse as time goes by. Also, park and roads systems are remarkably low than any other areas in Seoul. For example, percentage of park area is about 5.4% in this area while the mean data of Seoul is 28.1%. Recession of local economy, and decrease of local industries. There are about 500 handmade shoes industry businesses in this area, but most of them are small-scaled industry and most workers among them are old-aged so young-aged workers should be flow into the area so that the local industry can grow up bigger with the local economy. Continuous decrease of populations and vulnerable safety of the living environment. Population of this area has decreased about 26% since 1985 until these days, so the problem about the living safety was one of the most severe problems in this area.

Benchmark Projects

N/A

Public Engagement Strategy

N/A

Financing Strategy

They retained 9 billion won as this project was selected for Seoul city regenerating pilot project and Seongdong-gu’s matching fee 1 billion won for this city regenerating project. They also retained about 44 billion won by Seoul supporting fund, Seongdong-gu own business, and the fund of private enterprises.

Existing Community and Residents

To reflect various properties of this area, they divided subjects into three which are residents and industry and social economy. Considering the properties of these three categories, they made a survey. They progressed a satisfaction survey about the residential environments and industrial environments to study about this area and to know the opinion and the perception of the citizens in this area, they collected the opinions of the citizens in three categories above. With citizen participating groups they progressed the workshops and visited the several sites of this area.

Phasing Strategy

1. Planning Studying the background and the objectives and goals. Specific progresses and scales of planning. Detail progresses. 2. Studying the present condition. Common condition. Social cultural condition. Economic and industrial condition. Space condition. Local source condition. Diminishing categories condition. Collecting the opinions and perceptions of the residents. Total condition. 3. Vision and Goals Activating plans. Detail plans. 4. Activating plans and operating relevant organizations. 5. Financing Strategy.

The Master Plan

Described by the plans and rendering images and files below.

Land Uses and Programs

제1종일반주거지역, 제2종일반주거지역 (7층이하), 제2종일반주거지역, 제3종일반주거지역, 준주거지역, 일반상업지역, 준공업지역, 자연녹지지역 Type 1 general residential area, Type 2 general residential area ( Under 7 stories ), Type 2 general residential area, Type 3 general residential area, Semi residential area, General commercial area, Semi-industrial district, Natural green area 교육시설, 공공청사, 문화&복지시설, 공원 Educational facilities, public offices, cultural & welfare facilities, and parks.

Timeline or Milestones

2014.12 Seoul city-regenerating pilot project. 2015.4.1 Seongsu-dong city regenerating plan start 2015.4.6 Seongsu city-regenerating supporting center 2015.4.24~2016.8.31 City-regenerating briefing presentation ( about 80 times ) 2015.5.4 Residents participating party recruit. 2015.6.18 Seongsu city-regenerating blog and Facebook page 2015.6.25 Seongsu city-regenerating magazine 2015.7.8 ~ 10.1 Residents participating workshop and town visiting 2015.7.16~8.8 Residents survey ( Residential & Industrial & Social ) 2015.10.8 ~ 12.10 2015 Seongsu city-regenerating academy 2016.1.20 ~ 2016.8.29 2016 First half Residents public offering project 2016.9.26 ~ 2017.1.31 2016 Second half Residents public offering project 2016.10.17 Seongsu-dong city-regenerating public hearing 2016.10.14 ~ 10.20 Relevant organizations 2016.10.27 Gu-council opinion hearing 2016.11.23 Gu-urban planning commission hearing 2016.12.20 Seoul offer 2016.12.24 ~ 2017.1.4 Relevant organizations in Seoul approval 2017.2.3 Seoul expert hearing 2017.5.11 Seoul urban planning organization review 2017.6.1 Seongdong-gu Seongsu-dong City-regenerating area planning

Current Status

City regenerating supporting center. Sharing center. City regenerating academy. Social economic fashion industry. Re-up work room. Graphic design site light. Led street lamp.

Lessons Learned

What is the most important take away from this case?

The most important takeaway from this case is that this project reinforced the local industry so that this area could be both self-reliance and protect its own culture. This area had its own unique local industry. For example, handmade shoes were the most representative local industry in this area. However, most of them were small-scaled industry and most workers among them were old-aged and local economy got worse. So the only way that this area can get back to stable economy was to make this area can make jobs by itself and sustain with their capability. So, the reinforcing the local industries was necessary for this area and it should be the main takeaway from this project.

Why is this case relevant today and for whom?

I think the reason of why this case is relevant today is because of the local industry. Local industry is not just a industry but it also has a historical context, cultural context, and also a sustainability and capability of the area. These days, there are many areas having problems of diminishing local properties, and this case can be relevant for the people who are engaged in these issues.

Which strategy was proved to be successful?

Phasing strategy was proved to be successful. Because, after planning all the needs they have to do systemically for this project, they could objectively know what is the problems and issues in this area and what should be improved for this area to be regenerated well and what can be helpful and useful and sustainable even after the project is done. For example, after phasing all the plans they have to do, they successfully collected the opinions and perceptions of the residents by survey and studied well about the problems and issues by visiting the site and having a workshop with the residents and decided well to support local industries for sustainable regeneration for the social economy of this area.

In your opinion, what could have improved this project?

One of the biggest problems and issues of this area was the poor and inadequate living environment and the safety. So this project planned to regenerate the roads in this area for the stable circulation in this area, and improve the transportation by offering the bicycle roads and eco-friendly transportation systems and expand the infrastructures that were lack of both quantity and quality in this area. However, in this category, I think this project could not satisfy the need of this area very well. I think it could be better if they investigated more about what this area need for the better living condition and what kind of infrastructures do residents and industries in this area need. Then, this area could be regenerated into what they really wanted before.

Any other comments?

I think this project was partially worth the investment and partially not. Related to the successful strategy above, I think they successfully completed the project improving the local economy efficiently. But, related to the category that could be improved more that I stated above was not worth the investment.

References

ONLINE Resources and References
https://uri.seoul.go.kr/surc/main.do
OFFLINE Resources and References

서울형 도시재생 시범사업 성수동 도시재생활성화계획[안]

Evaluate

Leave a Reply

Contributor audex

audex

AUDEX is an acknowledgement that we need to start building on our own knowledge and experiences that applies to Asian cities and, perhaps, we can steer the global urbanization in the right direction. We believe in a collective intelligence. Powered by the internet and the network of professionals and experts in Asia, we propose to start by making sharing your experience and knowledge easier.